Optical film, polarizing plate including same, and display device including same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12196996
APP PUB NO 20210132278A1
SERIAL NO

17253523

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are an optical film, a polarizing plate including same, and a display device including same, the optical film comprising a first layer and second and third layers sequentially formed on the first layer, wherein the first layer and the third layer are each formed directly on the second layer, the first layer is a reverse wavelength dispersive negative A layer, the third layer is a positive C layer, and the ratio of the thickness of the second layer to the thickness of the third layer (the thickness of the second layer/the thickness of the third layer) is about 0.2 to about 2.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG SDI CO LTD150-20 GONGSE-RO GIHEUNG-GU GYEONGGI-DO YONGIN-SI 17084

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koo, Jun Mo Suwon-si, KR 55 1066
Lee, Sang Hum Suwon-si, KR 27 1
Shin, Dong Yoon Suwon-si, KR 54 185
You, Jung Hun Suwon-si, KR 29 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00