Method of amplifying work output to be greater than work input using a fully mechanical system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12196188
APP PUB NO 20240369044A1
SERIAL NO

18733154

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mechanical energy amplification system and method, where the system includes a frame that supports a cylindrical rotary reactor magnet assembly, an oscillating reactor magnet assembly, and an input impulse magnet assembly. The input impulse magnet assembly rotates an axial shaft connected to both the rotary reactor magnet assembly and a flywheel, and the oscillating reactor magnet assembly when pivoted back and forth, and generates a greater output energy than an energy input at the input impulse magnet assembly by increasing the pivoting of and torque of an output pivot shaft by the rotation of the shafts of the rotary reactor magnet assembly and the oscillating reactor magnet assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BOLD EARTH SCIENTIFIC LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Coppock, Andy LaGrange, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00