Electrolysis system with a buffer tank

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12195864
APP PUB NO 20240263332A1
SERIAL NO

18273490

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrolysis system with a buffer tank An electrolysis system for production of hydrogen and/or oxygen comprising a stack of electrolysis cells inside a pressure vessel (18). Each electrolysis cell in the stack comprises a membrane (82A, 82B) and a cassette (12) made of a bipolar plate (74) sand-wiched by a cathode (30B) and an anode (78) forming a cathode compartment and an anode compartment on each side of the bipolar plate (74). The stack is enclosed in a container constituting a buffer container for storing hydrogen released in the stack. The stack has an outlet constituting a hydrogen outlet for flow of hydrogen gas into said buffer container for filling the buffer container with hydrogen gas.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STIESDAL HYDROGEN A/SVEJLEVEJ 270 7323 GIVE 7323

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schibsbye, Karsten Fredericia, DK 58 299
Stiesdal, Henrik Odense C, DK 195 2928

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00