Method of manufacturing oxide crystal thin film

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12195844
APP PUB NO 20220049348A1
SERIAL NO

17515259

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a thin film manufacturing method which allows both a reduction in the carbon impurity concentration and a high film forming speed, as well as allows separate formation of stable crystal structures. There is provided a method for manufacturing an oxide crystal thin film. The method includes carrying raw material fine particles to a film forming chamber by means of a carrier gas, the raw material fine particles being formed from a raw material solution including water and at least one of a gallium compound and an indium compound, and forming an oxide crystal thin film on a sample on which films are to be formed, the sample being placed in the film forming chamber. At least one of the gallium compound and the indium compound is bromide or iodide.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FLOSFIA INC1-29 GORYOOHARA NISHIKYO-KU KYOTO-SHI KYOTO 615-8245

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hitora, Toshimi Kyoto, JP 52 257
Oda, Masaya Kyoto, JP 37 262

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00