Ethylene polymerization processes and reactor systems for the production of multimodal polymers using combinations of a loop reactor and a fluidized bed reactor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12195562
APP PUB NO 20240059808A1
SERIAL NO

18499276

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Polymerization processes and reactor systems for producing multimodal ethylene polymers are disclosed in which at least one loop reactor and at least one fluidized bed reactor are utilized. Configurations include a loop reactor in series with a fluidized bed reactor and two loop reactors in series with a fluidized bed reactor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHEVRON PHILLIPS CHEMICAL COMPANY LP10001 SIX PINES DRIVE THE WOODLANDS TX 77380

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Curren, Joseph A Houston, US 28 20
Dooley, Kenneth A Porter, US 23 13
Fodor, Jeffrey S Bartlesville, US 34 66
Kufeld, Scott E Houston, US 87 1251
Lowell, Jeffrey S Conroe, US 21 16
Mutchler, Joel A Porter, US 58 369
Netemeyer, Eric J Kingwood, US 36 272
Treptau, Michael H Kingwood, US 9 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00