Product comprising cement and supplementary cementitious material, and methods of making

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12195398
APP PUB NO 20220098104A1
SERIAL NO

17425352

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cement product including a supplementary cementitious material (SCM) including natural aluminosilicate, and optionally metakaolin, and methods of producing the cement product, and methods of use thereof are provided. The natural aluminosilicate may have, for example, a d97 less than or equal to about 19 μm; and may have a d10 less than or equal to about 2 μm. The product may also have improved chloride permeability as compared to cement products including natural aluminosilicates having higher d97 and d10 values. Also, the product may also have improved compressive strength and RCPT values when a portion of the natural aluminosilicate in the SCM is replaced with metakaolin.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IMERTECH SAS43 QUAI DE GRENELLE PARIS 75015

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dedeloudis, Christos Athens, GR 10 2
Kapralou, Christina Nea Makri, GR 8 1
Kotinis, Dionysios Jeddah, SA 2 0
Salem, Bassam Jeddah, SA 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00