System and method to sustainable integrated wastewater treatment and air-cooling in a steelmaking plant

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12195361
APP PUB NO 20240279079A1
SERIAL NO

18112140

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Some implementations provide an integrated system that includes: a wastewater treatment system configured to process wastewater released by one or more furnaces at a steelmaking plant, and generates reused wastewater using the wastewater; a heat recovery apparatus configured to utilize exhaust gas from the one or more furnaces at the steelmaking plant, and heat the reused wastewater generated by the wastewater treatment system above a threshold temperature; and a generator configured to receive, through a water inlet, the reused wastewater heated above the threshold temperature; and an absorption system arranged in circulation with the generator, and wherein the reused water is supplied above a threshold amount such that the generator drives the absorption system and produces cooled air inside the steelmaking plant.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANYDHAHRAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Ugla, Ali Abdulaziz Khobar, SA 10 39
Almutairi, Faisal B Dammam, SA 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00