Photothermal seawater desalination material with multi-stage structure and preparation method and use thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12195359
APP PUB NO 20230138777A1
SERIAL NO

17517825

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A photothermal seawater desalination material with a multi-stage structure and a preparation method and application thereof. The photothermal seawater desalination material includes a light-absorbing material having a C/WO3-x heterogeneous junction, which is obtained by depositing a nano-C material on a porous metal foam material using plasma enhanced chemical vapor deposition (PECVD), and then synthesizing WO3-x with plasma resonance effect by a solvothermal reaction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHANDONG UNIVERSITY OF SCIENCE AND TECHNOLOGY266510 NO 579 BAY ROAD HUANGDAO DISTRICT SHANDONG QINGDAO QINGDAO CITY SHANDONG PROVINCE 266510

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cui, Hongzhi Qingdao, CN 11 0
Li, Qi Qingdao, CN 318 2640
Li, Zhenkui Qingdao, CN 1 0
Song, Xiaojie Qingdao, CN 3 0
Sun, Kunyu Qingdao, CN 1 0
Wei, Na Qingdao, CN 130 1376
Xu, Ruiqi Qingdao, CN 4 8
Zhao, Minggang Qingdao, CN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00