System for treating bio-contaminated wastewater and process for decontaminating a wastewater source

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12195356
APP PUB NO 20230202871A1
SERIAL NO

18110121

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and process for decontaminating a bio-contaminated wastewater fluid as from a slaughterhouse or similar facility. The system and process recovers purified vapor/steam through a decontamination unit having a plurality of alternating rotating trays and fixed baffles in a processing vessel producing separate purified and contaminant streams. One or more filter/strainer units are disposed in parallel before the decontamination unit, and may be used alternately while the other is cleaned. A rotating shaft connected to the rotating trays may also connected to an electrical generator to provide electricity for circuits and controls in the system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VERNO HOLDINGS LLC6130 ELTON AVENUE LAS VEGAS NV 89107

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Riley, John D Santa Maria, US 13 128

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00