Steering assembly for vehicle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12195124
APP PUB NO 20230373561A1
SERIAL NO

18229250

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle includes a chassis and a front axle assembly. The chassis includes a first frame rail defining a first vertical plane and a second frame rail defining a second vertical plane. The front axle assembly includes an axle and a steering assembly. The axle is coupled to a front end of the first frame rail and the second frame rail. The steering assembly includes a pair of wheel hubs coupled to opposing ends of the axle, a steering gear mechanism including a first gear box and a second gear box, and a linkage assembly coupling the steering gear mechanism to the pair of wheel hubs to facilitate steering the pair of wheel hubs through actuation of the steering gear mechanism. The first gear box and the second gear box are positioned between the first vertical plane and the second vertical plane.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OSHKOSH CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andringa, Jeremy Oshkosh, US 41 411
Radlinger, Brent Oshkosh, US 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00