Electronic brake system and operation method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12194968
APP PUB NO 20220176931A1
SERIAL NO

17437054

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to an electronic brake system and an operation method thereof. The electronic brake system includes a reservoir in which a fluid is stored, a hydraulic pressure supply device configured to generate a hydraulic pressure by operating a hydraulic piston in response to a signal from a pedal displacement sensor detecting a displacement of a brake pedal, a hydraulic control unit including a first hydraulic unit configured to control the hydraulic pressure to be transferred from the hydraulic pressure supply device to a first hydraulic circuit including two wheel cylinders, and a second hydraulic unit configured to control the hydraulic pressure to be transferred from the hydraulic pressure supply device to a second hydraulic circuit including other two wheel cylinders.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HL MANDO CORPORATION32 HAMANHO-GIL POSEUNG-EUP PYEONGTAEK-SI GYEONGGI-DO 17962

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Jin Seok Gyeonggi-do, KR 95 894

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00