Method for controlling robot, robot system, and storage medium

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12194633
APP PUB NO 20220314441A1
SERIAL NO

17708258

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method for controlling a robot including a base, a robot arm coupled to the base, and a drive unit including a motor for driving the robot arm. The method includes a first step of acquiring weight information including information on a weight of an end effector installed on the robot arm and a weight of an object to be worked by the end effector, a second step of determining a frequency component to be removed from a drive signal for driving the motor based on the weight information acquired in the first step, and a third step of removing the frequency component determined in the second step from the drive signal to generate a correction drive signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEIKO EPSON CORPORATION1-6 SHINJUKU 4-CHOME SHINJUKU-KU TOKYO 160-8801

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sejimo, Isamu Azumino, JP 13 107

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00