Flow cell and biochemical substance reaction device using the flow cell

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12194469
APP PUB NO 20220339632A1
SERIAL NO

17763270

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A flow cell includes a flow cell body. The flow cell body includes a frame and a fluid chamber defined in the flow cell body. The fluid chamber includes a reaction region allowing a fluid flow. A liquid inlet, a liquid outlet, and two exhaust holes connected to the fluid chamber are in the frame. Fluid into the liquid inlet flows through the reaction region in the fluid chamber and flows out through the liquid outlet. The exhaust holes discharge gas generated in the fluid chamber during the fluid flow. A flow cell with integral sealing rings and a biochemical substance reaction device are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MGI TECH CO LTDMAIN BUILDING AND SECOND FLOOR OF NO 11 BUILDING BEISHAN INDUSTRIAL ZONE YANTIAN DISTRICT SHENZHEN 518083

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beecher, Jody San Jose, US 9 238
Gan, Yong Shenzhen, CN 22 41
Mei, Ping Shenzhen, CN 109 1852
Woo, Teresa San Jose, US 1 1
Xu, Hong Shenzhen, CN 259 3625
Yang, Joon Mo Sanjose, US 27 704

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00