System and method for preparing bone

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12193767
APP PUB NO 20240108419A1
SERIAL NO

18538370

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method includes generating a surgical plan for installation of a structure at a bone and controlling a controllable guide structure to guide a cutting tool to sculpt the bone and the structure based on the surgical plan. Sculpting the bone provides the bone with a bone mating surface and sculpting the structure provides the structure with a structure mating surface. The method also includes installing the structure on the bone by engaging the structure mating surface of the structure with the bone mating surface of the bone.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAKO SURGICAL CORP3365 ENTERPRISE AVE WESTON FL 33331

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jamieson, Miranda Fort Lauderdale, US 10 104
Mistry, Amit Plantation, US 37 1058
Nadzadi, Mark Ellsworth Memphis, US 51 1737
Nortman, Scott David Sunrise, US 11 195
Otto, Jason K Plantation, US 35 2096
Vorhis, Robert Van Davis, US 9 166

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00