System and method for configuring controlling device functionality

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12192559
APP PUB NO 20230370670A1
SERIAL NO

18224106

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A controlling device is automatically configured to issue a communication directly to a first controllable appliance to control a functional operation of the first controllable appliance in the event that the first controllable appliance is determined to be unresponsive to a command communication transmitted to the first controllable appliance via a digital communications link or to issue a communication to a second controllable appliance to control the functional operation of the first controllable appliance via a digital communications link in the event that first controllable appliance is determined to be responsive to a command communication transmitted to the first controllable appliance via a digital communications link.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • UNIVERSAL ELECTRONICS INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barnett, Brian Oakland, US 57 325
Hatambeiki, Arsham San Diego, US 126 1109
Perez, Jesus Costa Mesa, US 26 178
Xu, Rex Tustin, US 53 353

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 7, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00