Hybrid input LNA RF frontend architecture

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12191819
APP PUB NO 20230147703A1
SERIAL NO

17523584

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and devices for realizing RF processing paths associated to different frequency bands are presented. According to one aspect, the RF processing paths are provided by a hybrid input LNA RF frontend that includes RF processing paths that are dedicated to specific frequency bands and RF processing paths that are shared between several frequency bands. Sharing of the RF processing paths is provided by an input combiner network and/or a multi-input cascode amplifier that includes a cascode transistor that is coupled to at least two input transistors. Further presented in a toolkit that includes circuit blocks that can be used in specific combinations to customize the RF processing paths to achieve specific performance or cost optimization. A decision tree based on performance and cost priorities assigned to each of the frequency bands is used to provide the specific combinations.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MURATA MANUFACTURING CO LTDKYOTO JAPAN KYOTO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ayranci, Emre Costa Mesa, US 65 284
Sanner, Miles San Diego, US 56 196

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 7, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00