Using xenon concentration in controlling a nuclear power plant

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12191044
APP PUB NO 20230012716A1
SERIAL NO

17784036

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is for controlling a nuclear power plant comprising a pressurized water nuclear reactor. The method includes determining that an obtained waiting period and/or a remaining waiting period is greater than a first predetermined time allowing raising of a Xenon concentration to maximal value. The method further includes, responsive to the determination, moving one or more control rods out of the reactor core for compensating the reactivity loss due to an increase of the Xenon concentration, and moving the one or more control rods into the reactor core to a control rod setpoint for the start of power ramp up before the end of the obtained waiting period and/or remaining waiting period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FRAMATOME GMBH91052 ERLANGEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heike, Dreves Mainaschaff, DE 1 0
Hornung, Klaus-Peter Göllheim, DE 1 0
Kuhn, Andreas Geiselbach, DE 37 345
Petrasch, Andreas Fürth, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 7, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00