Multi-layer device including a light-transmissive electrode layer comprising a porous mesh or porous spheres

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12189260
APP PUB NO 20230197310A1
SERIAL NO

18071155

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-laver device and its method of manufacture are disclosed. The multi-layer device comprises a first electrode layer, a first repair layer, a functional layer, and a second electrode layer. The first repair layer comprises a conductive hydrogel film or conductive hydrogel beads, the conductive hydrogel film or the conductive hydrogel beads comprising conductive filler particles dispersed in a cross-linked polymer. The repair layer protects the multi-layer device from electrical short circuits. A multilayer device is also disclosed including a light-transmissive electrode layer comprising a porous mesh or porous spheres.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
E INK CORPORATION1000 TECHNOLOGY PARK DRIVE ATTN IP DEPARTMENT BILLERICA MA 01821-4165

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Murari, Nishit Billerica, US 9 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 7, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00