Concrete form systems, devices, and related methods

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12188232
APP PUB NO 20230407636A1
SERIAL NO

17841942

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A concrete form system includes a concrete form and a rebar tree. The concrete form includes at least one support column disposed at a lower portion of the concrete form and first and second connection branches disposed at an upper portion or the concrete form. The first and second connection branches are configured to be connected to second and first connection branches, respectively, of another concrete form. The first and second connection branches at least partially form one or more channels therebetween. The rebar tree includes a rebar mounting assembly configured to hold one or more pieces of rebar in one or more desired positions. The rebar mounting assembly is configured to be disposed within at least one of the one or more channels at least partially formed by the first and second connection branches.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ICF BUILDING SYSTEMS LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jessop, Alma South Jordan, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 7, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00