Methodologies to produce simulants of textured threat compounds

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12187661
APP PUB NO 20230202943A1
SERIAL NO

18109007

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various embodiments of the present invention are directed towards a simulant and method relating to producing a simulant. For example, a simulant of a textured target threat includes a background material associated with a background attenuation, and a texture component(s) dispersed in the background material and associated with a component attenuation and a component characteristic. The component characteristic prevents the component attenuation of the texture component from being homogeneously dispersed throughout the background attenuation of the background material, to cause the simulant to mimic an aspect(s) of an X-ray signature of the textured target threat.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE GOVERNMENT OF THE UNITED STATES OF AMERICA AS REPRESENTED BY THE SECRETARY OF HOMELAND SECURITYWASHINGTON DC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brogden, Michael Galloway, US 8 0
Krauss, Ronald Galloway, US 15 42
Pedersen, Kevin Atco, US 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 7, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00