Biocementation method and system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12187620
APP PUB NO 20230202859A1
SERIAL NO

18052066

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention is directed to kits, compositions, tools and methods comprising a cyclic industrial process to form biocement. In particular, the invention is directed to materials and methods for decomposing calcium carbonate into calcium oxide and carbon dioxide at an elevated temperature, reacting calcium oxide with ammonium chloride to form calcium chloride, water, and ammonia gas; and reacting ammonia gas and carbon dioxide at high pressure to form urea and water, which are then utilized to form biocement. This cyclic process can be achieved by combining industrial processes with the resulting product as biocement. The process may involve retention of calcium carbonate currently utilized in the manufacture of Portland Cement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BIOMASON INC2 TRIANGLE DRIVE DURHAM NC 27709

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dosier, Ginger K Raleigh, US 25 163
Dosier, John Michael Raleigh, US 4 11
Smith, Kent J Durham, US 40 577

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 7, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00