Method for the forming and finishing of an accessory cladding element for use in architecture and design

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12187020
APP PUB NO 20220355588A1
SERIAL NO

17621292

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for making an accessory cladding element for use in architecture and design. The method provides preparing an elastically deformable support element, including a first outer surface, in particular a decorated surface, a second outer surface and a plurality of spacer elements placed between the two surfaces. An impermeable and removable layer is applied on the first outer surface to protect at least a part thereof. Then a fluid cement mixture is prepared and introduced into the support element to obtain a cement-based composite structure in a deformable state. The excess fluid cement mixture is removed from the support element. The cement-based composite structure in the deformable state is positioned in a forming device which gives it the desired shape. The composite structure is solidified and after the removable layer is removed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POLITECNICO DI MILANO20133 MILANO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mainini, Andrea Giovanni Milan, IT 2 1
Poli, Tiziana Milan, IT 2 1
Speroni, Alberto Milan, IT 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 7, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00