Method for manufacturing a composite structure

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12186997
APP PUB NO 20220371287A1
SERIAL NO

17401115

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a composite structure having first and second structural members includes the steps of: (A) placing a plate in a forming mold having a first molding member, and a second molding member with an injection hole; (B) moving the first molding member toward the second molding member to stamp and deform the plate; (C) injecting a molten substrate onto the plate via the injection hole to stamp and deform again the plate so as to form the first structural member; (D) removing an assembly of the first structural member and a solidified substrate from the first molding member; and (E) removing an excess part of the solidified substrate to form the second structural member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GIANT GLORY INTERNATIONAL LIMITEDAPIA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsiao, Cheng-Ping Changzhi Township, TW 10 0
Huang, Yi-Feng New Taipei, TW 37 763

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 7, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00