Method for realising a garment provided with a belt to be worn on the lower limbs and a relative garment provided with a belt

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12185780
APP PUB NO 20240260696A1
SERIAL NO

18573829

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A garment is provided with a belt to be worn on the lower limbs. The garment is made using a fabric having a longitudinal extension axis. The fabric has a weft direction perpendicular to the longitudinal extension axis, and a warp direction parallel to the longitudinal extension axis. A first plurality of portions of fabric are made by making a first plurality of cut lines having an inclined direction with respect to the weft and warp directions. The inclined direction has an internal angle between 30° and 60° measured with respect to one of the weft or warp directions. The first plurality of portions of fabric are coupled to form a first strip. The first strip is overlapped and fixed to a first elastic strip to form a belt. The belt is fixed to a main body of garment that at least partially covers the lower limbs of a person.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
G T A MODA S R L35030 SELVAZZANO DENTRO (PD)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Buhaianu, Radu Adrian Selvazzano Dentro, IT 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 7, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00