Rotor core manufacturing method, and rotor core molding system therefore

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12184135
APP PUB NO 20240235347A1
SERIAL NO

18556191

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rotor core manufacturing method and system allow for molding permanent magnets in an unmolded rotor core to provide an electric motor molded rotor core. The unmolded rotor core includes a shaft and rotor core body having a central through-hole along a longitudinal axis, magnet cavities around the axis with magnets therein. The shaft lies in the central through-hole and projects therefrom, and the molded rotor core includes the rotor core body having the magnets fixed in the cavities. The method includes inserting an unmolded rotor core between the first and second molds of a rotor core molding system; moving the molds together to clamp the rotor core body of the unmolded rotor core with a predetermined pressure; providing a molding material into the magnet cavities; letting the molding material cure within the magnet cavities to a molded rotor core; opening the molds and removing the molded rotor core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOSCHMAN TECHNOLOGIES B V6921 EX DUIVEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brouwer, Erik Duiven, NL 1 0
Claassen, Hubert Wilhem Petrus Duiven, NL 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00