Energy storage power supply

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12184108
SERIAL NO

18520161

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides an energy storage power supply. The energy storage power supply includes a shell and a lighting device. The shell is provided with a lighting chamber. The lighting chamber is provided with a first light outlet. The lighting device includes a light-emitting component and a condensing lens. The lighting device is arranged in the lighting chamber. A light-emitting surface of the light-emitting component is arranged in a manner of facing the condensing lens and the first light outlet. The condensing lens is configured to condense light emitted by the light-emitting component to form a small light beam with a long illumination distance. Through the above structure, when a user uses the energy storage power supply in the open air or other occasions, purposes of a longer illumination distance and a clearer viewing field, which greatly improves the practicality and user experience of the energy storage power supply.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUANGDONG AOYUN TECHNOLOGY CO LTDGUANGDONG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhu, Xueping Guangdong, CN 71 442

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00