Separator for secondary battery, manufacturing method therefor, and lithium secondary battery comprising same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12183948
APP PUB NO 20220238958A1
SERIAL NO

17609804

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An embodiment provides a separator for a secondary battery, a manufacturing method therefor, and a lithium secondary battery comprising same, the separator including: a porous substrate; and a coating layer including a plurality of ring patterns on at least one surface of the porous substrate, wherein the ring patterns include a plurality of polymer particulates; the ring pattern is spaced apart from each other at regular intervals; a particle diameter of the ring pattern is 10 μm to 200 μm, and a ring of the ring pattern has a width (thickness of the ring) of 0.2 μm to 1.5 μm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG SDI CO LTD150-20 GONGSE-RO GIHEUNG-GU YONGIN-SI GYEONGGI-DO 17084

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Jaehyun Suwon-si, KR 26 56
Kim, Byung-Soo Suwon-si, KR 81 1075

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00