Growth of cubic crystalline phase structure on silicon substrates and devices comprising the cubic crystalline phase structure

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12183852
APP PUB NO 20210234070A1
SERIAL NO

17208905

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of forming a semiconductor structure includes providing a substrate comprising a first material portion and a single crystal silicon layer on the first material portion. The substrate further comprises a major front surface, a major backside surface opposing the major front surface, and a plurality of grooves positioned in the major front surface. A buffer layer is deposited in one or more of the plurality of grooves. A semiconductor material is epitaxially grown over the buffer layer and in the one or more plurality of grooves, the epitaxially grown semiconductor material comprising a hexagonal crystalline phase layer and a cubic crystalline phase structure disposed over the hexagonal crystalline phase.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RENSSELAER POLYTECHNIC INSTITUTE110 8TH STREET J BUILDING TROY NY 12180

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brueck, Steven R J Albuquerque, US 103 1830
Durniak, Mark Troy, US 9 37
Lee, Seung-Chang Albuquerque, US 34 167
Wetzel, Christian Troy, US 11 69

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00