Methods for copper doped hybrid metallization for line and via

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12183631
APP PUB NO 20230005789A1
SERIAL NO

17839817

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods for forming interconnects on a substrate with low resistivity and high dopant interfaces. In some embodiments, a method includes depositing a first copper layer with a dopant with a first dopant content of 0.5 percent to 10 percent in the interconnect by sputtering a first copper-based target at a first temperature of zero degrees Celsius to 200 degrees Celsius, annealing the substrate at a second temperature of 200 degrees Celsius to 400 degrees Celsius to reflow the first copper layer, depositing a second copper layer with the dopant with a second dopant content of zero percent to 0.5 percent by sputtering a second copper-based target at the first temperature of zero degrees Celsius to 200 degrees Celsius, and annealing the substrate at a third temperature of 200 degrees Celsius to 400 degrees Celsius to reflow the second copper layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
APPLIED MATERIALS INC3050 BOWERS AVENUE SANTA CLARA CA 95054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jansen, Alexander San Jose, US 21 148
Lee, Joung Joo San Jose, US 70 504
Liu, Lequn San Jose, US 32 35
Parikh, Suketu San Jose, US 16 149

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00