Single-loop nuclear power plant with pressurized coolant

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12183471
APP PUB NO 20210098141A1
SERIAL NO

16981657

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Single-loop nuclear power plant with a pressurized coolant, comprising a power generating unit and a throttling device having an impeller, which are interconnected by an outlet pipe and a feed pipe, and a steam turbine connected to the throttling device and to a condenser connected to the throttling device, vertically divided into a steam zone, a high pressure zone, and a low pressure zone by horizontal partitions. The high pressure zone is connected to the the feed pipe and is connected to the low pressure zone by throttling nozzles provided in the partition between said zones, and the low pressure zone is connected to the steam zone by a vertical pipe which passes through the horizontal sealed partitions and the high pressure zone. The single-loop nuclear power plant is provided with an electric motor to rotate the impeller.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JOINT STOCK COMPANY ATOMENERGOPROEKTUL BAKUNINSKAYA 7 STR 1 MOSCOW 107996
JOINT-STOCK COMPANY ENGINEERING COMPANY ASENIZHNIY NOVGOROD 603006

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Korovkin, Sergey Viktorovich Dolgoprudniy Moscovskaya, RU 1 0
Tutunina, Evgeniya Viktorovna Moscow, RU 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00