Regulating core air bled from a turbine engine core flowpath

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12180898
SERIAL NO

18400280

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An assembly is provided for a turbine engine. This assembly includes an engine core extending along an axis. The engine core includes a first compressor section, a second compressor section, a flowpath, a bleed port, an inner passage, an outer passage and a flow diverter. The flowpath extends longitudinally through the first compressor section and the second compressor section. The bleed port fluidly couples the flowpath to the inner passage and the outer passage in parallel. The bleed port is located longitudinally along the flowpath between the first compressor section and the second compressor section. The flow diverter is located at an inlet into the bleed port from the flowpath. The flow diverter is configured to move between a first position and a second position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RTX CORPORATION10 FARM SPRINGS ROAD FARMINGTON CT 06032

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kupratis, Daniel B Wallingford, US 53 833
McCaffrey, Michael G Windsor, US 219 2556
Zelesky, Mark F Bolton, US 115 1564

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00