PVC keder welded to vinyl awning canopy

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12180734
APP PUB NO 20220106807A1
SERIAL NO

17491998

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An awning keder includes an awning bead extending along a length of the keder that is sized for insertion into a keder rail, and a connecting panel coupled with the awning bead and extending along the length of the keder. The awning bead and the connecting panel are integrated into a one-piece keder. The one-piece component does not require additional assembly or alteration before welding onto a vinyl canopy, thereby cutting down on production time. The keder is also more durable and less susceptible to expansion or shrinkage resulting from environmental changes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LIPPERT COMPONENTS INC3501 COUNTY ROAD 6 EAST ELKHART IN 46514

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tibbetts, Scott Elkhart, US 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00