Post assembly with impact absorbing core mechanism

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12180662
APP PUB NO 20230097881A1
SERIAL NO

17953631

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A post assembly has a longitudinal axis extending from a proximal end to a distal end and includes a hollow outer shell, an anchoring sub-assembly disposed at the proximal end for securing the post assembly to a surface, a core assembly disposed within the hollow outer shell. The core assembly includes a core tube, a rigid rod having a lower end mechanically coupled to the anchoring sub-assembly and extending along the longitudinal axis to an upper end, and an elastic member disposed around the upper end of the rigid rod, the elastic member configured to transfer forces incident on the hollow outer shell through the elastic member to the anchoring sub-assembly via the rigid rod.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MCCUE CORPORATION125 WATER STREET DANVERS MA 01923

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mesa, Teodoro A Lynn, US 34 141
O'Brien, Matthew Gresham, US 51 732
Ustach, Thomas Boston, US 38 99

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00