Method for manufacturing glass sheet, and glass sheet and glass sheet assembly

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12180109
APP PUB NO 20220204393A1
SERIAL NO

17602473

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method of manufacturing a glass sheet having a through hole, including: a first step of preparing a glass sheet (1); and a second step of forming a through hole (2) in the glass sheet (1), wherein the first step includes, under conditions of: θ representing an inclination angle of an inner wall surface (2a) of the through hole (2) with respect to a sheet thickness direction; D representing a minimum hole width of the through hole (2); and an allowable variation range of the minimum hole width D being represented by A % of the minimum hole width D, preparing the glass sheet (1) for which a sheet thickness variation range ΔT satisfies the following relationship when the through hole (2) is gradually widened toward only one side of the sheet thickness direction: ΔT≤(D×A/tan θ)/200.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON ELECTRIC GLASS CO LTDOTSU-SHI SHIGA 520-8639

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Noda, Takayuki Shiga, JP 73 1027

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00