Compliant root structure for connecting an airfoil to a fuselage

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12179904
APP PUB NO 20230286638A1
SERIAL NO

17690081

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A compliant root structure for connecting an airfoil to a fuselage structure capable of dampening the dynamic response of the fuselage structure when the airfoil encounters abrupt aerodynamic loads due to a turbulent atmosphere. The compliant root structure includes a connecting arm(s) that pivotally connects the airfoil to the fuselage structure so that the airfoil can displace relative to the fuselage structure in the direction relatively perpendicular to the spanwise and chordwise axes of the airfoil. A restoring force can be provided by the compliant root structure (for example, by spring means) to the airfoil when it is displaced relative to the fuselage. In some embodiments, the connecting arms can exhibit relatively high flexibility, and can be adapted to interconnect the airfoil and the fuselage by means of rigid joints. The flexibility of these connecting arms may eliminate the need for a separate spring means.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COLLEY JOHN CHRISTIANTRAFFORD PA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Colley, John Christian Trafford, US 5 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00