Kick scooter performance enhancement

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12179878
APP PUB NO 20210261216A1
SERIAL NO

17317351

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The device provides an energy return mechanism associated with flexing and straightening of the scooter rider's support leg. The device includes an energy return mechanism having an end connected to the scooter such that resilient force exerted by the mechanism is longitudinally aligned with the scooter to act in a generally rearward/upward direction. A free end of the mechanism cradles the front of the rider's support leg, just below the knee. When the rider flexes the support leg, the resilient mechanism distorts in a longitudinal direction. When the rider straightens the leg, the forces stored in the resilient mechanism supplement the force of the rider's muscles. Thus, the device reduces the amount of energy used by the rider. The mechanism can be configured as an accessory to a conventional scooter or be integrated into a scooter. Certain embodiments are foldable and compatible with the foldable scooters.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAILAR BENJAMIN FPHILADELPHIA PA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bailar, Benjamin F Philadelphia, US 8 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00