High grip snow tire

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12179517
APP PUB NO 20220088969A1
SERIAL NO

17543739

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present application relates to a high grip snow tire, which belongs to a field of snow tire, including a carcass. The carcass is provided with pattern blocks and friction blocks on the circumferential surface thereof, which are positioned on the same side with the equatorial plane of the carcass. The pattern blocks and the friction blocks are successively distributed along the circumference of the carcass, and are in mirror symmetry about the equatorial plane. The friction block includes a plurality of fixing protrusions, which are gradually sharp along the direction away from the carcass. The carcass is provided with a protection groove on the surface thereof, and the fixing protrusions are positioned in the protection groove. The present application has the effect of improving the grip.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HEBEI WANDA TYRE CO LTD054600 GUANGZONG COUNTY ECONOMIC DEVELOPMENT ZONE XINGTAI CITY HEBEI PROVINCE XINGTAI CITY HEBEI PROVINCE 054600

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Geng, Peng Tianjin, CN 145 664
Lin, Mingzheng Tianjin, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00