Ultrasonic generation device and concrete forming system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12179385
APP PUB NO 20240286313A1
SERIAL NO

18576732

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ultrasonic generation device and a concrete forming system are provided. The ultrasonic generation device includes a housing, a rotary vibration member, and a shaft body. The housing is provided with an air inlet. The rotary vibration member is disposed in the housing. The shaft body is relatively fixed to the housing, the rotary vibration member is sleeved on the shaft body, and the rotary vibration member and the shaft body are rotatable relative to each other. The shaft body is provided with a main air passage and a jet hole, a first end of the main air passage is in communication with the air inlet and a second end of the main air passage is in communication with the jet hole, the jet hole is provided in the shaft body at a position corresponding to the rotary vibration member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIYUAN UNIVERSITY OF TECHNOLOGYNO 79 WEST STREET YINGZE WANBAILIN DISTRICT TAIYUAN 030024
SHANXI LINGXUDA TECHNOLOGY CO LTDROOM 512 NO 9 (HIGH-TECH INCUBATION PARK) NORTH FIRST RING ROAD CHANGZHI SHANXI 046000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kou, Ziming Shanxi, CN 25 7
Peng, Yanwei Shanxi, CN 1 0
Ren, Qichao Shanxi, CN 3 0
Wang, Hulin Shanxi, CN 2 2
Wu, Juan Shanxi, CN 41 94
Yan, Feng Shanxi, CN 189 2058
Zhang, Buwen Shanxi, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00