Photoelectric conversion device and sensor and electronic device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12178125
APP PUB NO 20230354705A1
SERIAL NO

18347960

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are a photoelectric conversion device, and a sensor and an electronic device including the same. The photoelectric conversion device may include a first electrode and a second electrode and a photoelectric conversion layer between the first electrode and the second electrode. The photoelectric conversion layer includes a first material and a second material, which form a pn junction, and a third material that is different from the first material and the second material. The third material is configured to modify a distribution of energy levels of the first material or the second material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO. LTD.

International Classification(s)

  • No Non-US Classification to display

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heo, Chul Joon Busan, KR 84 273
Minami, Daiki Suwon-si, KR 12 1
Park, Kyung Bae Hwaseong-si, KR 155 815
Park, Sung Jun Yongin-si, KR 551 10774
Yun, Sung Young Suwon-si, KR 105 525

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • No Patent Citation Ranking to display

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00