Test device and test method for DFB-LD for RoF system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12176950
APP PUB NO 20240121002A1
SERIAL NO

18389942

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A test device and method for testing a distributed feedback laser diode (DFB-LD) device for an optical transceiver of a radio over fiber (RoF) system examines the DFB-LD device based on an absolute limiting rating, an operating case environment, and a functional specification, in which the absolute limiting rating is a rating at which there is no fatal damage to the DFB-LD device during a short period of time when each limiting parameter is isolated and all other parameters are in a normal performance parameter, the operating case environment includes an operating temperature, and the functional specification includes parameters to be tested according to an operating condition for the functional specification.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELECTRONICS AND TELECOMMUNICATIONS RESEARCH INSTITUTEDAEJEON

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Seung-Hyun Sejong-si, KR 87 723
Lee, Joon Ki Sejong-si, KR 71 328

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00