High-voltage power distributor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12176690
APP PUB NO 20230208128A1
SERIAL NO

18071441

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power distributor (200) with at least two incoming lines (101-103) and a method for manufacturing such a power distributor is suggested. Each incoming line has a conductor (106,107) and an individual screen (114). The conductors of the incoming lines are connected at a connection point (V1, V2), which is enclosed by a screen shield (201) that contacts each individual screen (114) of the incoming lines. The screen shield (201) is made from electrically conducting plastic material. Screen shields made from electrically conducting plastic material is easier to manufacture and less expensive than metal screen shields.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEXANS8 RUE DU GENERAL FOY PARIS 75008

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Döllinger, Ulrich Floss, DE 1 0
Ehlich, Wolfgang Floss, DE 1 0
Frank, Christoph Floss, DE 6 0
Kroop, Tobias Floss, DE 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00