Electro-absorption modulator with improved photocurrent uniformity

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12176677
APP PUB NO 20210203126A1
SERIAL NO

16728999

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are integrated electro-absorption modulators (EAM) that are structured and/or operated to improve uniformity of the photocurrent density along the active region. In various embodiments, this improvement results from increased optical absorption at the rear of the EAM, e.g., as achieved by heating a region at the rear, increasing a bias voltage applied across the EAM towards the rear, or changing a material composition of an intrinsic layer towards the rear. In another embodiment, the improvement is achieved by coupling light from a waveguide into the EAM active region continuously along a length of the EAM, using overlap between a tapered section of the waveguide and the EAM.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OPENLIGHT PHOTONICS INC6868 CORTONA DRIVE SUITE C GOLETA CA 93117

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Parker, John Goleta, US 145 2584

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00