Aparatus and method for dismantling for heavy water reactor facilities

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12176115
APP PUB NO 20220068514A1
SERIAL NO

17422834

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A heavy-water reactor facility dismantling apparatus according to an embodiment includes: a first cutting device for cutting the periphery of a first nozzle portion of a calandria, wherein the first nozzle portion is connected to the upper end of a first pipe positioned in the calandria of a heavy-water reactor facility; a second cutting device for cutting a first support part of the calandria, wherein the first support portion is connected to the lower end of the first pipe connected to the first nozzle portion; and a fixing and drawing device for fixing and drawing the first nozzle portion cut by the first cutting device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA HYDRO & NUCLEAR POWER CO LTD1655 BULGUK-RO YANGBUK-MYEON GYEONGJU-SI GYEONGSANGBUK-DO 38120

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hwang, Seok-Ju Daejeon, KR 19 5
Hwang, Young Hwan Daejeon, KR 27 17
Kim, Cheon-Woo Daejeon, KR 31 51
Yoon, Ju-Young Daejeon, KR 69 923

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00