Package expanded beam connector for on-package optics

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12174436
APP PUB NO 20220308294A1
SERIAL NO

17214035

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments disclosed herein include photonics packages and systems. In an embodiment, a photonics package comprises a package substrate, where the package substrate comprises a cutout along an edge of the package substrate. In an embodiment, a photonics die is coupled to the package substrate, and the photonics die is positioned adjacent to the cutout. In an embodiment, the photonics package further comprises a receptacle for receiving a pluggable optical connector. In an embodiment, the receptacle is over the cutout.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEL CORPORATION2200 MISSION COLLEGE BOULEVARD SANTA CLARA CA 95054

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Coons, Todd R Gilbert, US 9 37
Deshpande, Nitin Chandler, US 42 120
Li, Xiaoqian Chandler, US 60 40
Morgan, Wesley Lake Oswego, US 6 3
Murtagian, Gregorio R Phoenix, US 21 65
Nekkanty, Srikant Chandler, US 51 69
Pratap, Divya Hillsboro, US 13 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00