Earth leakage detecting device, and vehicular power supply system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12174267
APP PUB NO 20220413061A1
SERIAL NO

17756316

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first voltage output unit generates a cyclic voltage that changes cyclically, and applies the cyclic voltage to the other end of a coupling capacitor via a first resistance. A second resistance and a third resistance are connected in series between a node and a second voltage output unit, the node being between the coupling capacitor and the first resistance. A voltage measurement unit measures a voltage at a voltage dividing point between the second resistance and the third resistance. In a period in which two types of fixed voltages are applied to the voltage dividing point in order, a diagnosing unit determines whether the leakage detecting device is in a normal state, based on the voltage measured by the voltage measurement unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SANYO ELECTRIC CO LTDOSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakayama, Masato Hyogo, JP 49 256

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00