Method for producing a pulse inverter, current measuring device for a pulse inverter, pulse inverter and motor vehicle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12174221
APP PUB NO 20230243873A1
SERIAL NO

18163815

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a pulse inverter comprising a module with electronic components, a contact bar sticking out from a side of the module, a current measuring device arranged on the contact bar, and a control board arranged on the module with a driver circuit, wherein the driver circuit makes contact with the module across control contacting pins of the module and with the current measuring device across measurement contacting pins of the current measuring device, wherein the current measuring device is movably attached to the contact bar, after which the control board is positioned such that the control contacting pins are led through control contact openings of the control board and the current measuring device is displaced such that the measurement contacting pins are led through measurement contact openings of the control board, after which the current measuring device is secured to the contact bar and/or the control board.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AUDI AGGERMANY INGOLSTADT INGOLSTADT BAVARIA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Meier, Christoph Eitensheim, DE 47 484
Söhnle, Benjamin Ingolstadt, DE 12 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00