Automatic pressure test and equalization to wellhead pressure

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12173596
SERIAL NO

18496522

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method for controlling a pumps configured to pump fluid from a fluid supply to a frac iron configuration. A pressure schedule is defined, the pressure schedule including a pumps assigned to sets of pumps, wherein each set of pumps is associated with a pressure level and wherein each set of pumps except a first set of pumps is a subset of a previous set of pumps. The first set of pumps is enabled to pump fluid continuously until the fluid in the manifold has reached a predetermined pressure level. A processor then automatically disables the electric pumps that are not in the next set of electric pumps, while allowing the next set of pumps to continue to pump fluid until the fluid in the manifold has reached the next pressure level. This continues until the manifold is at the desired pressure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALLIBURTON ENERGY SERVICES INC3000 N SAM HOUSTON PARKWAY E HOUSTON TX 77032-3219

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Forrest, Gregory R Houston, US 1 0
Handke, Glen Leo Duncan, US 1 0
Hunter, Timothy Holiman Duncan, US 74 598
Kohli, Madhur Houston, US 7 86
Mazrooee, Mehdi Houston, US 18 187
Pyka, Shaun Kyle Houston, US 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00