Lift drive for a rail-guided cantilever construction device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12173458
SERIAL NO

17433115

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lift drive for a rail-guided cantilever construction device. The cantilever construction device comprises a main frame guided by at least one rail for receiving at least one formwork. The lift drive comprises a lift device, a first end of the lift device is designed to be connected to the main frame, and a second lift device end opposite the first end can be moved relative to the main frame when the first end of the lift device is connected to the main frame; a first fixing device connected to the first end of the lift device and designed to fix the first end of the lift device with respect to the at least one rail; and a second fixing device connected to the second end of the lift device and designed to fix the second end of the lift device with respect to the at least one rail.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PERI SE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huber, Julian Merklingen, DE 8 3
Zwerenz, Andre Oy-Mittelberg, DE 6 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00