Arrangement and method for degassing a pump

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12173451
APP PUB NO 20220025578A1
SERIAL NO

17297942

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An arrangement and a method for controlling a gas flow separated from a suspension of medium consistency pulp. The pulp is treated in a pulp treatment apparatus including a first pump and a second pump, wherein the second pump is a degassing centrifugal pump provided with a degassing system including a degassing conduit in which a degassing valve is arranged for regulating a pressure difference between an inlet of the second pump and the degassing conduit. The degassing system further includes a pressurized degassing vessel working under overpressure and having an inlet and an outlet, wherein the outlet of the vessel is connected to a pressure control valve for maintaining a desired overpressure in the vessel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ANDRITZ OY00180 HELSINKI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Geiger, Ronny Curitiba, BR 3 0
Peltonen, Kari Kotka, FI 18 93

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00