Vehicle with electrical traction including an energy management system, and method for managing the energy in such a vehicle with electrical traction

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12172526
APP PUB NO 20230057202A1
SERIAL NO

17797974

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle has an electric traction chain to supply a drive torque to the wheels, and an energy management system comprising: a generator set configured to generate a first supply voltage and mechanically disconnected from the wheels in every operating condition; a battery storage assembly configured to generate a second supply voltage; a control unit that implements operative conditions of the vehicle, including: (i) powering the electrical traction chain with the first supply voltage; (ii) powering the electrical traction chain with the second supply voltage; (iii) recharging the storage assembly with a network voltage external to the vehicle and coming from a catenary; (iv) recharging the storage assembly with the first supply voltage; and (v) recharging the storage assembly with a recovered voltage generated by the traction chain operating as an electrical generator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI RAIL STS S P A80147 NAPOLI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cirillo, Francesco Naples, IT 3 26
Di, Lella Simone Naples, IT 1 2
Graber, Giuseppe Naples, IT 4 2
Iengo, Luigi Naples, IT 1 2
Schiavo, Roberta Naples, IT 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00